Keywords: outdoor GDOT is planning to construct a new interchange at S.R. 316 and S.R. 11. The new interchange would feature a full diamond interchange design. The new bridge over S.R. 316/U.S. 29 would also accommodate a future widening of S.R 316 from four to six lanes, plus a grade barrier separated HOV lane. Work will begin 2019. GDOT is planning to construct a new interchange at S.R. 316 and S.R. 11. The new interchange would feature a full diamond interchange design. The new bridge over S.R. 316/U.S. 29 would also accommodate a future widening of S.R 316 from four to six lanes, plus a grade barrier separated HOV lane. Work will begin 2019. |